When carrying out the construction work of tunnel, etc., (meaning excavating work of tunnels, etc., or transportation of muck, materials, etc., or lining concrete placing, etc., associated with the excavating work (limited to the work carried out inside the tunnel, etc., or at a place in the vicinity of the tunnel, etc.); the same applies hereinafter), the employer must take the following measures to prevent the dangers to workers due to cave-in or falling of rocks:
事業者は、ずい道等の建設の作業(ずい道等の掘削の作業又はこれに伴うずり、資材等の運搬、覆工のコンクリートの打設等の作業(当該ずい道等の内部又は当該ずい道等に近接する場合において行なわれるものに限る。)をいう。以下同じ。)を行なうときは、落盤又は肌落ちによる労働者の危険を防止するため、次の措置を講じなければならない。
to designate an inspector and have the person inspect the ground inside the tunnels, etc., each day and after a moderate or greater earthquake on the existence and condition of loose stones and cracks, and changes in the condition of water content and spring water; and
点検者を指名して、ずい道等の内部の地山について、毎日及び中震以上の地震の後、浮石及びき裂の有無及び状態並びに含水及び湧水の状態の変化を点検させること。
to designate an inspector and after blasting work is carried out, have the person inspect the location where the blasting work has been carried out and its surroundings on the existence and condition of loose stones and cracks.
点検者を指名して、発破を行なつた後、当該発破を行なつた箇所及びその周辺の浮石及びき裂の有無及び状態を点検させること。
定義第二十四条の六第一項
ずい道及びたて坑以外の坑(採石法(昭和二十五年法律第二百九十一号)第二条に規定する岩石の採取のためのものを除く。)
わかりやすく言うと
ずい道と、たて坑以外の坑をまとめた呼び名です。ただし、採石法で定める花こう岩などの岩石を採取するための坑は含みません。