1 条
With respect to simplified forestry cableway work, the employer must inspect the matters listed in the right column of the following table in accordance with the cases listed in the left column of the same table, and if finding any abnormality, must immediately repair or replace the relevant part.
| Cases requiring inspection | Matters to be inspected |
| When about to start the day's work | State of the supports and anchors Presence or absence of abnormalities in the yarder and brake, and the state of their installation Presence or absence of abnormalities in the work ropes, stay ropes, anchor ropes and cargo lifting ropes, and the state of their attachment State of the fastening part between the carrier or the loading block and the wire rope Presence or absence of abnormalities in the devices of telephone, electric bell, etc. set forth in Article 151-165, paragraph (1) |
| After bad weather conditions such as strong wind, heavy rain or heavy snow, and after a moderate or greater earthquake | State of the supports and anchors Presence or absence of abnormalities in the yarder and brake, and the state of their installation Presence or absence of abnormalities in the work ropes, stay ropes, anchor ropes and cargo lifting ropes, and the state of their attachment Presence or absence of abnormalities in the devices of telephone, electric bell, etc. set forth in Article 151-165, paragraph (1) |
事業者は、簡易林業架線作業については、次の表の上欄に掲げる場合に応じ、それぞれ同表の下欄に掲げる事項を点検し、異常を認めたときは、直ちに、補修し、又は取り替えなければならない。
| 点検を要する場合 | 点検事項 |
| その日の作業を開始しようとする場合 | 支柱及びアンカの状態 集材機及び制動機の異常の有無及びその据付けの状態 作業索、控索、台付け索及び荷吊り索の異常の有無及びその取付けの状態 搬器又はロージングブロツクとワイヤロープとの緊結部の状態 第百五十一条の百六十五第一項の電話、電鈴等の装置の異常の有無 |
| 強風、大雨、大雪等の悪天候の後及び中震以上の地震の後の場合 | 支柱及びアンカの状態 集材機及び制動機の異常の有無及びその据付けの状態 作業索、控索、台付け索及び荷吊り索の異常の有無及びその取付けの状態 第百五十一条の百六十五第一項の電話、電鈴等の装置の異常の有無 |
この改正法ができた当時の規定を指しています。その後の改正で、今の規定は別の内容になっていることがあるため、リンクしていません。この法令は本サイトに収録していないため、開ける条文がありません。どの規定を指しているかを特定できなかったため、リンクしていません。