When carrying out forestry cableway work, the employer must establish in advance a work plan suited to what has become known through the investigation under the provisions of the preceding Article, and carry out the work in accordance with that work plan.
The work plan set forth in the preceding paragraph must indicate the following matters:
前項の作業計画は、次の事項が示されているものでなければならない。
places where supports and the main equipment is installed;
支柱及び主要機器の配置の場所
type and diameter of wire ropes to be used;
使用するワイヤロープの種類及びその直径
central dangling ratio;
中央垂下比
maximum working load, distance between carriers, and maximum loading capacity of each carrier;
最大使用荷重、搬器と搬器の間隔及び搬器ごとの最大積載荷重
type and maximum traction force of the yarder of the skyline logging cable crane;
機械集材装置の集材機の種類及び最大けん引力
method of forestry cableway work; and
林業架線作業の方法
emergency measures to be taken in the event of an industrial injury and method of transporting injured or ill persons.
労働災害が発生した場合の応急の措置及び傷病者の搬送の方法
Read this with the articles around it
skyline logging cable cranemachine translation
「機械集材装置」
Equipment made up of a yarder, overhead cables, a carriage, supports and their fittings that uses power to winch up logs or wood for firewood or charcoal and carry them through the air.
Defined inArticle 36, paragraph (1), item (vii)
forestry cableway workmachine translation
「林業架線作業」
Assembling, dismantling, changing or repairing a cable yarding system (機械集材装置) or a timber cableway (運材索道), or gathering or carrying timber with them.
Defined inArticle 151-124, paragraph (1)