Article 380Construction Plan

第三百八十条(施工計画)

When carrying out excavating work of tunnels, etc., the employer must formulate in advance a construction plan that conforms to what became known by the investigation prescribed in the preceding Article, and carry out the work according to the plan.

事業者は、ずい道等の掘削の作業を行なうときは、あらかじめ、前条の調査により知り得たところに適応する施工計画を定め、かつ、当該施工計画により作業を行なわなければならない。

The construction plan set forth in the preceding paragraph must indicate the following matters:

前項の施工計画は、次の事項が示されているものでなければならない。

the method of excavation; and

掘削の方法

the method of construction of tunnel shoring, construction of lining, disposal of spring water or flammable gas, and ventilation or illumination when these operations are to be carried out.

ずい道支保工の施工、覆工の施工、湧水若しくは可燃性ガスの処理、換気又は照明を行う場合にあつては、これらの方法