The employer must make the structure of the shoring solid in accordance with the condition of landform, nature of the soil, strata, cracks, water content, spring water, freezing and underground-installed objects, etc., pertaining to the natural ground where the shoring is to be installed.
事業者は、土止め支保工の構造については、当該土止め支保工を設ける箇所の地山に係る形状、地質、地層、き裂、含水、湧水、凍結及び埋設物等の状態に応じた堅固なものとしなければならない。
Read this with the articles around it
underground installation, etc.
「埋設物等」
Buried objects and other structures under the ground.
Short name set inArticle 94-2, paragraph (1), item (i), (a)· applies only in this provision and in Article 634-2; and Part 2, Chapter 6, Section 1