The employer must make the structure of tunnel shoring solid in accordance with the condition of nature of the soil, strata, water content, spring water, cracks and loose stones pertaining to the natural ground where the tunnel shoring is to be installed and the method of excavation.
事業者は、ずい道支保工の構造については、当該ずい道支保工を設ける箇所の地山に係る地質、地層、含水、湧水、き裂及び浮石の状態並びに掘削の方法に応じた堅固なものとしなければならない。
Read this with the articles around it