Article 395Removal of Components

第三百九十五条(部材の取りはずし)

When removing components of tunnel shoring to which a load is applied, the employer must not remove the components unless measures to remove the load applied to the components to tunnel concrete form shoring, etc. have been taken.

事業者は、荷重がかかつているずい道支保工の部材を取りはずすときは、当該部材にかかつている荷重をずい道型わく支保工等に移す措置を講じた後でなければ、当該部材を取りはずしてはならない。