When carrying out the open-cut excavation work inside a caisson or inside a well curb, the employer must take the following measures to prevent dangers to workers due to the rapid subsidence of the caisson or well curb:
一
沈下関係図に基づき、掘削の方法、載荷の量等を定めること。
to determine the method of excavation, the quantity of load, etc., based on the diagram on subsidence;
二
刃口から天井又ははりまでの高さは、一・八メートル以上とすること。
to have the height from the cutting edge to the ceiling or the girder 1.8 m or higher.
When carrying out the open-cut excavation work inside a caisson, a well curb, a vertical shaft, a well or other buildings or facilities equivalent to them (hereinafter referred to as "caissons, etc."), the employer must take the following measures:
一
酸素が過剰になるおそれのあるときは、酸素の濃度を測定する者を指名して測定を行わせること。
when there is a risk of the quantity of oxygen becoming excessive, to designate a person in charge of measuring the concentration of oxygen, and have the person measure the concentration;
二
労働者が安全に昇降するための設備を設けること。
to provide facilities for workers to safely ascend to and descend from the workplace;
when the depth of excavation exceeds 20 m, to provide devices such as a telephone, an electric bell, etc., for communication between the workplace and the outside.
In the case referred to in the preceding paragraph, when excessive oxygen is found as a result of the measurement set forth in item (i) of the same paragraph, or when the depth of excavation has exceeded 20 m, the employer must provide facilities for air supply and send the necessary quantity of air using the facilities.
第三百七十八条
(作業の禁止)Prohibition of Work
第一項
事業者は、次の各号のいずれかに該当するときは、潜函等の内部で明り掘削の作業を行なつてはならない。
In the case falling under any of the following items, the employer must not carry out the open-cut excavation work inside caissons, etc.:
一
前条第一項第二号若しくは第三号又は同条第二項の設備が故障しているとき。
when the facilities set forth in paragraph (1), item (ii) or (iii) of the preceding Article or in paragraph (2) of the same Article are out of order; or
二
潜函等の内部へ多量の水が浸入するおそれのあるとき。
when there is a risk of a large quantity of water entering into the caissons, etc.
When carrying out the excavating work of tunnels, etc., the employer must investigate in advance the landform of natural ground and condition of the nature of the soil and strata pertaining to the excavation work by boring or other appropriate method in order to prevent workers from dangers due to cave-in, inundation, gas explosion, etc., and record the result of the investigation.
When carrying out excavating work of tunnels, etc., the employer must formulate in advance a construction plan that conforms to what became known by the investigation prescribed in the preceding Article, and carry out the work according to the plan.
第二項
前項の施工計画は、次の事項が示されているものでなければならない。
The construction plan set forth in the preceding paragraph must indicate the following matters:
the method of construction of tunnel shoring, construction of lining, disposal of spring water or flammable gas, and ventilation or illumination when these operations are to be carried out.
When carrying out excavating work of tunnels, etc., the employer must observe the following matters at the excavation site and the natural ground surrounding the site each day in order to prevent dangers to workers due to cave-in, inundation, gas explosion, etc., and record the results of the observation:
一
地質及び地層の状態
condition of nature of the soil and strata;
二
含水及び湧水の有無及び状態
existence and condition of water content, and spring water;
三
可燃性ガスの有無及び状態
existence and condition of flammable gas; and
四
高温のガス及び蒸気の有無及び状態
existence and condition of high-temperature gas or vapor.
When the excavation is carried out by the method in which excavation site and its surrounding natural ground are covered with a machine, the observation pertaining to the matters set forth in item (iii) of the preceding paragraph must be carried out using a measuring instrument.
When carrying out the construction work of tunnel, etc., (meaning excavating work of tunnels, etc., or transportation of muck, materials, etc., or lining concrete placing, etc., associated with the excavating work (limited to the work carried out inside the tunnel, etc., or at a place in the vicinity of the tunnel, etc.); the same applies hereinafter), the employer must take the following measures to prevent the dangers to workers due to cave-in or falling of rocks:
to designate an inspector and have the person inspect the ground inside the tunnels, etc., each day and after a moderate or greater earthquake on the existence and condition of loose stones and cracks, and changes in the condition of water content and spring water; and
to designate an inspector and after blasting work is carried out, have the person inspect the location where the blasting work has been carried out and its surroundings on the existence and condition of loose stones and cracks.
第三百八十二条の二
(可燃性ガスの濃度の測定等)Measurement of the Concentration of Flammable Gas
In carrying out the construction work of tunnels, etc., when there is a risk of flammable gas to be generated, the employer must designate a person in charge of measuring the concentration of the flammable gas in order to prevent explosion or fire, and have the person measure and record the concentration of the flammable gas at the places where there is a risk of the flammable gas to be generated or stagnate each day before commencing the work for the day, after a moderate or greater earthquake or when having found any abnormality related to the flammable gas.
第三百八十二条の三
(自動警報装置の設置等)Installation of Automatic Warning Devices
When it is found as a result of the measurement set forth in the preceding Article that the flammable gas exists which may cause an explosion or fire, the employer must install automatic warning devices at necessary places for an early detection of abnormal rise in the concentration of the flammable gas. In this case, the automatic warning devices must have a mechanism that enables to quickly alert workers who are working around the area of the detectors of the devices of the abnormal rise in the concentration of the flammable gas.
As regards the automatic warning device set forth in the preceding paragraph, the employer must inspect the following matters before commencing the work for the day, and immediately make repairs when having found any abnormality:
In carrying out excavating work of tunnels, etc., when the construction plan set forth in Article 380, paragraph (1) becomes unsuitable to the conditions of natural ground which became known by the observation pursuant to the provisions of Article 381, paragraph (1), the inspection pursuant to the provisions of Article 382, the measurement pursuant to the provisions of Article 382-2, etc., the employer must change the construction plan without delay so that suits the conditions of the natural ground, and carry out the excavating work according to the changed construction plan.
第三百八十三条の二
(ずい道等の掘削等作業主任者の選任)Appointment of an Operations Supervisor of Excavating Tunnel
As regards the work set forth in Article 6, item (x)-2 of the Order, the employer must appoint an operations supervisor of excavating tunnel, etc., from the persons who have completed the skill training course for operations supervisor of excavating tunnel, etc.
第三百八十三条の三
(ずい道等の掘削等作業主任者の職務)Duties of the Operations Supervisor of Excavating Tunnel
第一項
事業者は、ずい道等の掘削等作業主任者に、次の事項を行わせなければならない。
The employer must have the operations supervisor of excavating tunnel, etc., carry out the following matters:
一
作業の方法及び労働者の配置を決定し、作業を直接指揮すること。
to decide the work method and arrangement of workers, and directly supervise the work;
二
換気等の方法を決定し、労働者に使用させる呼吸用保護具を選択すること。
to decide the method of ventilation, etc., and select the respirators to be used by workers;
三
器具、工具、要求性能墜落制止用器具等、保護帽及び呼吸用保護具の機能を点検し、不良品を取り除くこと。
to inspect the functions of the instruments, tools, fall arrest equipment with the required performance, etc., safety helmets, and respirators, and remove those defective; and
四
要求性能墜落制止用器具等、保護帽及び呼吸用保護具の使用状況を監視すること。
to monitor the use of fall arrest equipment with the required performance, etc., safety helmets, and respirators.
第三百八十三条の四
(ずい道等の覆工作業主任者の選任)Appointment of an Operations Supervisor of Lining of Tunnel
As regards the work set forth in Article 6, item (x)-3 of the Order, the employer must appoint an operations supervisor of lining of tunnel, etc., from the persons who have completed the skill training course for operations supervisor of lining of tunnel, etc.
第三百八十三条の五
(ずい道等の覆工作業主任者の職務)Duties of the Operations Supervisor of Lining of Tunnel
第一項
事業者は、ずい道等の覆工作業主任者に、次の事項を行わせなければならない。
The employer must have the operations supervisor of lining of tunnel, etc., carry out the following matters:
一
作業の方法及び労働者の配置を決定し、作業を直接指揮すること。
to decide the work method and arrangement of workers, and directly supervise the work;
二
器具、工具、要求性能墜落制止用器具等及び保護帽の機能を点検し、不良品を取り除くこと。
to inspect the functions of instruments, tools, fall arrest equipment with the required performance, etc., and safety helmets, and remove those defective; and
三
要求性能墜落制止用器具等及び保護帽の使用状況を監視すること。
to monitor the use of fall arrest equipment with the required performance, etc., and safety helmets.
In carrying out the construction work of tunnels, etc., when there is a risk of endangering workers due to a cave-in or fall of rocks, the employer must take measure such as providing tunnel shoring, use rock bolts and removing loose stones in order to prevent such dangers.
第三百八十五条
(出入口附近の地山の崩壊等による危険の防止)Prevention of Dangers Due to Collapse of Natural Ground in the Vicinity of the Entrance
In carrying out the construction work of tunnels, etc., when there is a risk of endangering workers due to collapse of natural ground or fallen soil and stones in the vicinity of the entrance or exit of the tunnels, etc., the employer must take measures such as providing shoring, setting up protective nets and removing loose stones in order to prevent such dangers.
When carrying out work at the following places, the employer must prohibit persons other than persons engaged in work pertaining to the place concerned from entering the place, by displaying at a readily visible place that such entry is prohibited or by other methods:
places where the work to remove loose stones is being carried out or below those places, where there is a risk of causing danger due to fallen loose stones; and
places where the work of reinforcing or repairing tunnel shoring is being carried out and where there is a risk of causing danger due to cave-in or falling of rocks.
In carrying out construction work of tunnels, etc., when visibility inside tunnels, etc., is highly limited by exhaust gas, dust, etc., the employer must take measures such as ventilating tunnels, etc., and spraying water in order to maintain the visibility necessary to safely carry out the work.
第三百八十八条
(準用)Application, Mutatis Mutandis
第一項
第三百六十四条から第三百六十七条までの規定は、ずい道等の建設の作業について準用する。
The provisions of Articles 364 through 367 apply mutatis mutandis to construction work of tunnels, etc.
第一款の三 爆発、火災等の防止
第三百八十九条
(発火具の携帯禁止等)Prohibition against Carrying Ignitable Objects
When it is found as a result of the measurement pursuant to the provisions of Article 382-2 that flammable gas exists, the employer must prohibit workers from carrying fire, matches, lighters or other ignitable objects into the inside of the tunnels, etc., excluding the cases where it is unavoidable due to the nature of the work, and display a notice to that effect at a readily visible place in the vicinity of the entrance of the tunnels, etc.
第三百八十九条の二
(自動警報装置が作動した場合の措置)Measures in the Case Automatic Warning Device is Activated
The employer must establish measures that the workers concerned should take to prevent an explosion or fire due to flammable gas when the automatic warning device set forth in Article 382-3 is activated, in advance, and make the measures known to the workers.