Chapter II Construction Machines (Articles 171-3 to 186)
The law as Ministerial Order Partially Amending the Ordinance on Industrial Safety and Health and the Ordinance for Enforcement of the Act on Ensuring the Proper Operation of Worker Dispatching Services and Protecting Dispatched Workers (Ministry of Health, Labour and Welfare Order No. 120 of 2025) leaves it, with the words it changes marked.
The main text is read a page at a time: a chapter to a page, and a long chapter in runs of articles. The whole main text, and the supplementary provisions and appended tables this amendment changes. Those it leaves untouched are on the page for the text in force.
Article 171-3第百七十一条の三
Supervision of Work(作業指揮)
Article 171-3, paragraph (1)
When assembling or dismantling a transport pipe, etc., the employer must establish the method and procedures, etc., of the work, make them known to the workers, designate a person who supervises the work and have the workers carry out the work under the person's direct supervision.
At a road shoulder, an inclined place, etc. where there is a risk of endangering workers due to overturning or falling of a demolition machine whose total length of boom and arm is 12 m or more (hereinafter in this Article referred to as a "specified demolition machine"), the employer must not carry out work using a specified demolition machine; provided, however, that this does not apply when, at that place, measures to prevent that danger in accordance with the landform and the condition of the nature of the soil, etc. have been taken.
When there is a risk of endangering the operator due to objects that come flying, etc., the employer must not carry out work using a demolition machine without a driver's cabin; provided, however, that this does not apply when measures to prevent that danger in accordance with the circumstances of objects that come flying, etc. have been taken.
When carrying out work using a demolition machine, the employer must take the following measures (excluding the measure in item (ii) for the work set forth in Article 6, items (xv)-2, (xv)-3 and (xv)-5 of the Order):
to prohibit persons other than the operator from entering a place where there is a risk of danger due to objects that come flying, etc., by indicating the prohibition in a conspicuous place or by other methods;
to suspend the work when dangers involved in carrying out the work are expected due to bad weather conditions such as strong wind, heavy rain or heavy snow.
Section 2 Pile Driver, Pile Drawer, and Boring Machine第二節 くい打機、くい抜機及びボーリングマシン
Article 172第百七十二条
Strength(強度等)
Article 172, paragraph (1)
As regards bodies, accessory devices and fittings of a pile driver and a pile drawer driven by power (excluding those capable of self-propelling to unspecified places) and a boring machine, the employer must not use them unless they fall under the following requirements:
having necessary strength that conforms to the purpose of use; and
使用の目的に適応した必要な強度を有すること。
Article 172, paragraph (1), item (ii)
being free from marked damage, wear, deformation or corrosion.
著しい損傷、摩耗、変形又は腐食のないものであること。
Article 173第百七十三条
Prevention of Collapse(倒壊防止)
Article 173, paragraph (1)
As regards a pile driver driven by power (hereinafter referred to as "pile driver") or a pile drawer driven by power (hereinafter referred to as "pile drawer") or a boring machine, the employer must take the following measures for preventing its collapse:
when installing the machine on soft ground, to use boards, blocks, etc., for preventing settling of legs or the cradle;
軟弱な地盤に据え付けるときは、脚部又は架台の沈下を防止するため、敷板、敷角等を使用すること。
Article 173, paragraph (1), item (ii)
when installing the machine in facilities or on a temporary construction, to confirm the durability, and when the durability is insufficient, to reinforce the durability;
施設、仮設物等に据え付けるときは、その耐力を確認し、耐力が不足しているときは、これを補強すること。
Article 173, paragraph (1), item (iii)
when there is a risk of the leg part or the cradle to slide, to secure the leg part or the cradle by using piles, wedges, etc.;
脚部又は架台が滑動するおそれのあるときは、くい、くさび等を用いてこれを固定させること。
Article 173, paragraph (1), item (iv)
for a pile driver, a pile drawer or a boring machine designed to be moved on rollers or on rail tracks, to secure the machine with rail clamps, a stopper, etc., in order to prevent it from moving unexpectedly;
when the top part is to be stabilized only with stays (including bracing wires; hereinafter the same applies in this Section), to use three or more stays and secure each end of the stays to a sound tie bar, iron frame, etc.;
when the top part is to be stabilized only with bracing wires, to stabilize the top part in all directions by methods such as arranging the bracing wires at equal intervals and increasing the number of bracing wires; and
Prohibition of the Use of an Inadequate Wire Rope(不適格なワイヤロープの使用禁止)
Article 174, paragraph (1)
As regards a hoisting wire rope for a pile driver, a pile drawer or a boring machine, the employer must not use the ropes falling under any of the following items:
those in which 10% or more of the element wires (excluding filler wires; the same applies hereinafter in this item) have broken within one lay of the wire rope;
The safety coefficient set forth in the preceding paragraph is to be the value obtained by dividing the breaking load of the wire rope by the maximum value of the load applied on to the wire rope.
hoisting wire ropes are to have a length sufficient to leave at least two windings on their drum of the hoisting equipment at the time when the dropping weight or hammer is placed at the lowest position, at the position for starting the drawing of a sheet pile or the suspension tool, including the rod, is at its lowest position;
hoisting wire ropes to be fixed securely to the drum of the hoisting device with clamps, clips, etc.; and
巻上げ用ワイヤロープは、巻上げ装置の巻胴にクランプ、クリツプ等を用いて、確実に取り付けること。
Article 176, paragraph (1), item (iii)
in connecting a dropping weight or a hammer to the hoisting wire rope of the pile driver or connecting the hoisting wire rope of the boring machine to a pulley block, a hoisting swivel, etc., clamps, clips, etc. are to be used to securely connect them.
As regards hoisting wire ropes, pulley blocks, etc., of a pile drawer or a boring machine, the employer must securely connect them with piles, sheet piles, rods, etc., by using such tools as shackles, checking fixtures, hoisting swivels, etc., that have sufficient strength.
As regards the winch used for a pile driver, a pile drawer or a boring machine, the employer must provide the machine with a ratchet or a brake equipped with a clamp; provided, however, that this does not apply to the winch used for a boring machine with a braking device such as a band brake.
As regards a winch of a pile driver, a pile drawer or a boring machine, the employer must install it in a manner that floating, shifting, sway, etc., may be prevented.
As regards the distance between the shaft of a drum barrel of a pile driver, pile drawer or boring machine and the shaft of the first sheave from the hoisting equipment, the employer must set the distance to a value equivalent to 15 times or more of the width of the drum of the hoisting equipment.
The sheave referred to in the preceding paragraph must go through the center of the drum of the hoisting equipment and be placed on a plane perpendicular to the shaft.
前項のみぞ車は、巻上げ装置の巻胴の中心を通り、かつ、軸に垂直な面上になければならない。
Article 180, paragraph (3)
The provisions of the preceding two paragraphs do not apply to the cases falling under any of the following items:
前二項の規定は、次の各号のいずれかに該当するときは、適用しない。
Article 180, paragraph (3), item (i)
when there is no risk of irregular winding of the hoisting wire rope due to the structure of the pile driver, a pile drawer or a boring machine; or
くい打機、くい抜機又はボーリングマシンの構造上、巻上げ用ワイヤロープが乱巻となるおそれのないとき。
Article 180, paragraph (3), item (ii)
when a boring machine is used for work in a very confined space such as a tunnel, etc., and the employer has prohibited a person engaged in work at the workshop from entering an area where there is a risk of danger due to the hoisting wire rope being cut, by indicating the prohibition in a conspicuous place or by other methods.
As regards sheaves or pulley blocks of a pile driver, a pile drawer or a boring machine, the employer must fasten the devices securely using fittings, shackles, wire ropes, etc., which do not have the risk of breaking by the load applied to the fixed part.
As regards sheaves of a pile driver, a pile drawer or a boring machine in which the winch is not integrated with the tower or the twin pillar, etc., the employer must place the sheaves so that the horizontal component of force acting on the hoisting wire rope does not affect the tower or the twin-pole; provided, however, when measures such as providing a prop to the leg of the tower or the twin pillar to support the leg by wire ropes are taken, sheaves may be fixed on the leg.
to firmly connect a steam hose or an air hose with a hammer at a place other than the joint parts of the hose and the hammer for preventing damages or disconnection of these joints parts due to the motion of the hammer.
to install a device for cutting off steam or air at a place where a hammer operator is able to easily handle the device.
蒸気又は空気をしや断するための装置をハンマーの運転者が容易に操作することができる位置に設けること。
Article 184第百八十四条
Measures to Be Taken When Irregular Winding Occurs(乱巻時の措置)
Article 184, paragraph (1)
When a wire rope is wound irregularly on the drum of the hoisting equipment of a pile driver, a pile drawer or a boring machine, the employer must not have workers apply a load on the hoisting wire rope.
Measures to Be Taken When the Hoisting Device is Suspended(巻上げ装置停止時の措置)
Article 185, paragraph (1)
When leaving a hoisting device of a pile driver, a pile drawer or a boring machine suspended with the load applied to the hoisting equipment, the employer must securely suspend the machine by applying ratchets and using a brake with clamp.
Prohibition of Leaving the Operating Station(運転位置からの離脱の禁止)
Article 186, paragraph (1)
The employer must not allow the operator of a pile driver, a pile drawer or a boring machine to leave the operating station of the machine while loads are applied to the hoisting equipment.
The operator set forth in the preceding paragraph must not leave the operating station of a pile driver, a pile drawer or a boring machine while loads are applied to the hoisting equipment.
前項の運転者は、巻上げ装置に荷重をかけたままで運転位置を離れてはならない。
Copy link
Coming into force施行
The day a law or an amendment starts to apply. It is often months or years after promulgation, so that people have time to prepare. The Ministry of Justice's English usually says a law "comes into force" or "comes into effect", and sometimes calls the day its "enforcement date". Its "enforcement" more often means the word's other sense, carrying a law out, as in an Order for Enforcement (施行令), the Cabinet Order (政令) that sets out the details for carrying out an Act.
The Ministry of Justice's English of this passage has a slip, so the English shown is this site's correction of it. The Ministry printed:
when the top part is to be stabilized only with bracing wires, to stabilize the top part in all directions by methods such as arranging the bracing wires at equal intervals and increasing the number of staying wires; and
Japanese Law Translation, Ministry of Justice
Translates the law as amended by Order of the Ministry of Health, Labour and Welfare No. 185 of 2006 (平成十八年厚生労働省令第百八十五号)
The Ministry of Justice's English of this passage has a slip, so the English shown is this site's correction of it. The Ministry printed:
As regards hoisting wire ropes, pulley blocks, etc., of a pile driver or a boring machine, the employer must securely connect them with poles, sheet piles, rods, etc., by using such tools as shackles, checking fixtures, hoisting swivels, etc., that have sufficient strength.
Japanese Law Translation, Ministry of Justice
Translates the law as amended by Order of the Ministry of Health, Labour and Welfare No. 185 of 2006 (平成十八年厚生労働省令第百八十五号)
The Ministry of Justice's English of this passage has a slip, so the English shown is this site's correction of it. The Ministry printed:
As regards sheaves of a pile driver, a pile drawer or a boring machine in which the winch is not integrated with the tower or the twin pillar, etc., the employer must place the winch so that the horizontal component of force acting on the hoisting wire rope does not affect the tower or the twin-pole; provided, however, when measures such as providing a prop to the leg of the tower or the twin pillar to support the leg by wire ropes are taken, sheaves may be fixed on the leg.
Japanese Law Translation, Ministry of Justice
Translates the law as amended by Order of the Ministry of Health, Labour and Welfare No. 185 of 2006 (平成十八年厚生労働省令第百八十五号)
The Ministry of Justice's English of this passage has a slip, so the English shown is this site's correction of it. The Ministry printed:
The operator set forth in the preceding paragraph must not leave the operating station of a pile driver or a pile drawer while loads are applied to the hoisting equipment.