Chapter XI Working Platforms

The law as Ministerial Order Partially Amending the Ordinance on Industrial Safety and Health and the Ordinance for Enforcement of the Act on Ensuring the Proper Operation of Worker Dispatching Services and Protecting Dispatched Workers (Ministry of Health, Labour and Welfare Order No. 120 of 2025) leaves it, with the words it changes marked.

The main text is read a page at a time: a chapter to a page, and a long chapter in runs of articles. The whole main text, and the supplementary provisions and appended tables this amendment changes. Those it leaves untouched are on the page for the text in force.

How the changes are shown

Underlined: words the amendment adds. A bar: where it removes words.Underlined: words the amendment adds. Struck through: the words it removes.Underlined: words the amendment adds. Struck through: the words it removes.

Chapter XI Working Platforms第十一章 作業構台

Article 575-2第五百七十五条の二

Materials(材料等)
Article 575-2, paragraph (1)

As regards materials used for the facilities composed of temporary supports, work platforms, etc., for the purpose of piling up materials or temporary equipment, or of installing or moving construction machines, etc., and having a height of 2 m or more (hereinafter referred to as "working platforms"), the employer must not use those with marked damage, deformation or corrosion.

事業者は、仮設の支柱及び作業床等により構成され、材料若しくは仮設機材の集積又は建設機械等の設置若しくは移動を目的とする高さが二メートル以上の設備で、建設工事に使用するもの(以下「作業構台」という。)の材料については、著しい損傷、変形又は腐食のあるものを使用してはならない。

Article 575-2, paragraph (2)

As regards the lumbers for working platforms, the employer must not use them unless they are free from cracks, worm-eaten spots, gnarls, slant fibers that are marked defects in terms of strength.

事業者は、作業構台に使用する木材については、強度上の著しい欠点となる割れ、虫食い、節、繊維の傾斜等がないものでなければ、使用してはならない。

Article 575-2, paragraph (3)

As regards steel materials for main parts of supports, work floors, girders, sleepers, etc. to be used for working platforms, the employer must not use them unless they conform to the Japanese Industrial Standard G 3101 (Rolled Steel for General Structure), Japanese Industrial Standard G 3106 (Rolled Steel for Welded Structure), Japanese Industrial Standard G 3191 (Hot Rolled Steel Bar), Japanese Industrial Standard G 3192 (Hot Rolled Steel Sections), Japanese Industrial Standard G 3444 (Carbon Steel Tubes for General Structural Purposes) or Japanese Industrial Standard G 3466 (Carbon Steel Square Pipes for General Structural Purposes), or have a tensile strength equal to or greater than that prescribed in those Standards and an elongation corresponding to that tensile strength.

事業者は、作業構台に使用する支柱、作業床、はり、大引き等の主要な部分の鋼材については、日本産業規格G三一〇一(一般構造用圧延鋼材)、日本産業規格G三一〇六(溶接構造用圧延鋼材)、日本工業規格G三一九一(熱間圧延棒鋼)、日本工業規格G三一九二(熱間圧延形鋼)、日本産業規格G三四四四(一般構造用炭素鋼鋼管)若しくは日本産業規格G三四六六(一般構造用角形鋼管)に定める規格に適合するもの又はこれと同等以上の引張強さ及びこれに応じた伸びを有するものでなければ、使用してはならない。

Article 575-3第五百七十五条の三

Structure(構造)
Article 575-3, paragraph (1)

As regards the working platforms, the employer must not use them unless they are of solid structure that do not have a risk of marked twist, strain, etc. being caused.

事業者は、作業構台については、著しいねじれ、たわみ等が生ずるおそれのない丈夫な構造のものでなければ、使用してはならない。

Article 575-4第五百七十五条の四

Maximum Loading Capacity(最大積載荷重)
Article 575-4, paragraph (1)

The employer must determine the maximum loading capacity of the work floor in accordance with the structure and material of a working platform, and not place a load exceeding the maximum loading capacity.

事業者は、作業構台の構造及び材料に応じて、作業床の最大積載荷重を定め、かつ、これを超えて積載してはならない。

Article 575-4, paragraph (2)

The employer must make the maximum loading capacity set forth in the preceding paragraph known to workers.

事業者は、前項の最大積載荷重を労働者に周知させなければならない。

Article 575-5第五百七十五条の五

Assembly Drawing(組立図)
Article 575-5, paragraph (1)

When assembling a working platform, the employer must prepare an assembly drawing and build the working platform according to the assembly drawing.

事業者は、作業構台を組み立てるときは、組立図を作成し、かつ、当該組立図により組み立てなければならない。

Article 575-5, paragraph (2)

The assembly drawing set forth in the preceding paragraph must indicate the layout and size of supports, work floors, girders, sleepers, etc.

前項の組立図は、支柱、作業床、はり、大引き等の部材の配置及び寸法が示されているものでなければならない。

Article 575-6第五百七十五条の六

Measures to Be Taken for Working Platforms(作業構台についての措置)
Article 575-6, paragraph (1)

As regards working platforms, the employer must conform to requirements set forth in the following items:

事業者は、作業構台については、次に定めるところによらなければならない。

Article 575-6, paragraph (1), item (i)

for the supports of the working platforms, to take measures such as embedding in accordance with the condition of the nature of the soil, etc., of the place where the working platform is to be installed, providing of bridge battens of foot posts at the fixing part of the legs, using plankings, square timbers, etc., in order to prevent the working platform from sliding or subsiding;

作業構台の支柱は、その滑動又は沈下を防止するため、当該作業構台を設置する場所の地質等の状態に応じた根入れを行い、当該支柱の脚部に根がらみを設け、敷板、敷角等を使用する等の措置を講ずること。

Article 575-6, paragraph (1), item (ii)

to securely fasten the fastening, connecting and mounting parts of supports, girders, diagonal bracings, etc., with clamps, etc., in order to prevent their displacement, coming off, etc.;

支柱、はり、筋かい等の緊結部、接続部又は取付部は、変位、脱落等が生じないよう緊結金具等で堅固に固定すること。

Article 575-6, paragraph (1), item (iii)

the clearance between floor materials of work floors having the height of 2 m or more is to be 3 cm or less;

高さ二メートル以上の作業床の床材間の隙間は、三センチメートル以下とすること。

Article 575-6, paragraph (1), item (iv)

at the edges of work floors having a height of 2 m or more, at places where there is a risk of endangering workers due to falling, to provide handrails, etc. and mid-rails, etc. (limited in each case to equipment of strong structure that is free from the risk of bending and free from marked damage, deformation or corrosion).

高さ二メートル以上の作業床の端で、墜落により労働者に危険を及ぼすおそれのある箇所には、手すり等及び中桟等(それぞれ丈夫な構造の設備であつて、たわみが生ずるおそれがなく、かつ、著しい損傷、変形又は腐食がないものに限る。)を設けること。

Article 575-6, paragraph (2)

The provisions of item (iv) of the preceding paragraph do not apply when it is markedly difficult to provide handrails, etc. and mid-rails, etc. due to the nature of the work, or when handrails, etc. or mid-rails, etc. are temporarily removed due to the necessity of the work, if the following measures have been taken:

前項第四号の規定は、作業の性質上手すり等及び中桟等を設けることが著しく困難な場合又は作業の必要上臨時に手すり等又は中桟等を取り外す場合において、次の措置を講じたときは、適用しない。

Article 575-6, paragraph (2), item (i)

to take measures to provide facilities, etc. for safely attaching fall arrest equipment with the required performance and have workers use fall arrest equipment with the required performance, or measures having an effect equal to or greater than those measures;

要求性能墜落制止用器具を安全に取り付けるための設備等を設け、かつ、労働者に要求性能墜落制止用器具を使用させる措置又はこれと同等以上の効果を有する措置を講ずること。

Article 575-6, paragraph (2), item (ii)

to prohibit persons other than the persons engaged in work relating to the place where the measures set forth in the preceding item are taken from entering that place, by displaying a sign to that effect at a readily visible place or by other means.

前号の措置を講ずる箇所に関係する作業従事者以外の者が立ち入ることについて、禁止する旨を見やすい箇所に表示することその他の方法により禁止すること。

Article 575-6, paragraph (3)

When having temporarily removed handrails, etc. or mid-rails, etc. due to the necessity of the work pursuant to the provisions of the preceding paragraph, the employer must immediately restore this equipment to its original condition after the necessity has ceased.

事業者は、前項の規定により作業の必要上臨時に手すり等又は中桟等を取り外したときは、その必要がなくなつた後、直ちにこれらの設備を原状に復さなければならない。

Article 575-6, paragraph (4)

In the case set forth in paragraph (2), when workers have been instructed to use fall arrest equipment with the required performance, they must use it.

労働者は、第二項の場合において、要求性能墜落制止用器具の使用を命じられたときは、これを使用しなければならない。

Article 575-7第五百七十五条の七

Assembling of the Working Platform(作業構台の組立て等の作業)
Article 575-7, paragraph (1)

When carrying out the work of assembling, dismantling or altering a working platform, the employer must take the following measures:

事業者は、作業構台の組立て、解体又は変更の作業を行うときは、次の措置を講じなければならない。

Article 575-7, paragraph (1), item (i)

to make the time, scope and procedures of assembling, dismantling or altering known to the worker engaging in the work;

組立て、解体又は変更の時期、範囲及び順序を当該作業に従事する労働者に周知させること。

Article 575-7, paragraph (1), item (ii)

to prohibit persons other than the persons engaged in work relating to the work from entering the area where the work of assembling, dismantling or altering is carried out, by displaying a sign to that effect at a readily visible place or by other means;

組立て、解体又は変更の作業を行う区域内に当該作業に関係する作業従事者以外の者が立ち入ることについて、禁止する旨を見やすい箇所に表示することその他の方法により禁止すること。

Article 575-7, paragraph (1), item (iii)

to suspend the work when dangers in carrying out the work are expected due to bad weather conditions such as strong wind, heavy rain or heavy snow; and

強風、大雨、大雪等の悪天候のため、作業の実施について危険が予想されるときは、当該作業を中止すること。

Article 575-7, paragraph (1), item (iv)

when lifting or lowering materials, equipment, tools, etc., to have workers use lifting ropes, lifting bags, etc.

材料、器具、工具等を上げ、又は下ろすときは、つり綱、つり袋等を労働者に使用させること。

Article 575-8第五百七十五条の八

Inspection(点検)
Article 575-8, paragraph (1)

When carrying out work on working platforms, the employer must inspect, before commencing the work for the day, the existence of removal and coming off of handrails, etc. and mid-rails, etc. provided at the place where the work is carried out, and when having found any abnormality, must immediately make repairs.

事業者は、作業構台における作業を行うときは、その日の作業を開始する前に、作業を行う箇所に設けた手すり等及び中桟等の取り外し及び脱落の有無について点検し、異常を認めたときは、直ちに補修しなければならない。

Article 575-8, paragraph (2)

When carrying out the work on a working platform after bad weather conditions such as strong wind, heavy rain or heavy snow or a moderate or greater earthquake, or assembling, partially dismantling or altering a working platform, the employer must inspect the following matters before commencing the work, and immediately make repairs when having found any abnormality:

事業者は、強風、大雨、大雪等の悪天候若しくは中震以上の地震又は作業構台の組立て、一部解体若しくは変更の後において、作業構台における作業を行うときは、作業を開始する前に、次の事項について、点検し、異常を認めたときは、直ちに補修しなければならない。

Article 575-8, paragraph (2), item (i)

condition of sliding and subsidence of supports;

支柱の滑動及び沈下の状態

Article 575-8, paragraph (2), item (ii)

existence of damage of supports, girders, etc.;

支柱、はり等の損傷の有無

Article 575-8, paragraph (2), item (iii)

condition of damage, mounting and placing of floor materials;

床材の損傷、取付け及び掛渡しの状態

Article 575-8, paragraph (2), item (iv)

condition of loosening at the fastening, connecting and mounting parts of supports, girders, diagonal bracings, etc.;

支柱、はり、筋かい等の緊結部、接続部及び取付部の緩みの状態

Article 575-8, paragraph (2), item (v)

condition of damage and corrosion of clamping materials and clamps;

緊結材及び緊結金具の損傷及び腐食の状態

Article 575-8, paragraph (2), item (vi)

condition of mounting of horizontal collar braces, diagonal bracings and other reinforcement materials and whether they have been removed; and

水平つなぎ、筋かい等の補強材の取付状態及び取り外しの有無

Article 575-8, paragraph (2), item (vii)

whether handrails, etc. and mid-rails, etc. have been removed or come off.

手すり等及び中桟等の取り外し及び脱落の有無

Article 575-8, paragraph (3)

When having conducted the inspection under the preceding paragraph, the employer must record the following matters and retain the records until the completion of the project in which work using the working platform is carried out:

事業者は、前項の点検を行つたときは、次の事項を記録し、作業構台を使用する作業を行う仕事が終了するまでの間、これを保存しなければならない。

Article 575-8, paragraph (3), item (i)

the result of the inspection;

当該点検の結果

Article 575-8, paragraph (3), item (ii)

when measures such as repairs have been taken based on the result set forth in the preceding item, the details of the measures.

前号の結果に基づいて補修等の措置を講じた場合にあつては、当該措置の内容