労働安全衛生規則(ろうどうあんぜんえいせいきそく)

Chapter VIII-5 Prevention of Dangers in Demolishing Concrete Structures

The law as Ministerial Order Partially Amending the Safety Ordinance for Cranes and the Ordinance on Industrial Safety and Health (Ministry of Health, Labour and Welfare Order No. 90 of 2026) leaves it, with the words it changes marked.

The main text is read a page at a time: a chapter to a page, and a long chapter in runs of articles. The whole main text, and the supplementary provisions and appended tables this amendment changes. Those it leaves untouched are on the page for the text in force.

How the changes are shown

Underlined: words the amendment adds. A bar: where it removes words.Underlined: words the amendment adds. Struck through: the words it removes.Underlined: words the amendment adds. Struck through: the words it removes.

Chapter VIII-5 Prevention of Dangers in Demolishing Concrete Structures第八章の五 コンクリート造の工作物の解体等の作業における危険の防止

Article 517-14第五百十七条の十四

Investigation and Work Plan(調査及び作業計画)
Article 517-14, paragraph (1)

When carrying out the work set forth in Article 6, item (xv)-5 of the Order, the employer must investigate in advance the shape of the structure, presence of cracks, and the surrounding environment, etc., and formulate a work plan that conforms with what became known by the investigation in order to prevent workers from dangers due to collapsing of the structure, flying and falling, etc., of objects, and carry out the work according to the work plan.

事業者は、令第六条第十五号の五の作業を行うときは、工作物の倒壊、物体の飛来又は落下等による労働者の危険を防止するため、あらかじめ、当該工作物の形状、き裂の有無、周囲の状況等を調査し、当該調査により知り得たところに適応する作業計画を定め、かつ、当該作業計画により作業を行わなければならない。

Article 517-14, paragraph (2)

The work plan set forth in the preceding paragraph must indicate the following matters:

前項の作業計画は、次の事項が示されているものでなければならない。

Article 517-14, paragraph (2), item (i)

the method and procedures of the work;

作業の方法及び順序

Article 517-14, paragraph (2), item (ii)

the type and capability of the machinery or other such equipment to be used; and

使用する機械等の種類及び能力

Article 517-14, paragraph (2), item (iii)

the method of installation of stays, establishment of the prohibited entry area, and any other measures for preventing workers from dangers due to the collapse or falling of outer walls, posts, girders, etc.

控えの設置、立入禁止区域の設定その他の外壁、柱、はり等の倒壊又は落下による労働者の危険を防止するための方法

Article 517-14, paragraph (3)

When having formulated the work plan set forth in paragraph (1), the employer must make the matters set forth in items (i) and (iii) of the preceding paragraph known to the workers concerned.

事業者は、第一項の作業計画を定めたときは、前項第一号及び第三号の事項について関係労働者に周知させなければならない。

Article 517-15第五百十七条の十五

Work of Demolishing a Concrete Structure(コンクリート造の工作物の解体等の作業)
Article 517-15, paragraph (1)

When carrying out the work set forth in Article 6, item (xv)-5 of the Order, the employer must take the following measures:

事業者は、令第六条第十五号の五の作業を行うときは、次の措置を講じなければならない。

Article 517-15, paragraph (1), item (i)

to prohibit persons other than persons engaged in work concerned from entering the area in which the work is carried out, by displaying at a readily visible place that such entry is prohibited or by other methods;

当該作業を行う区域内に関係する作業従事者以外の者が立ち入ることについて、禁止する旨を見やすい箇所に表示することその他の方法により禁止すること。

Article 517-15, paragraph (1), item (ii)

to suspend the work when dangers in carrying out the work are expected due to bad weather conditions such as strong wind, heavy rain, and heavy snow; and

強風、大雨、大雪等の悪天候のため、作業の実施について危険が予想されるときは、当該作業を中止すること。

Article 517-15, paragraph (1), item (iii)

when lifting or lowering equipment, tools, etc., to have workers use lifting ropes, lifting bags, etc.

器具、工具等を上げ、又は下ろすときは、つり綱、つり袋等を労働者に使用させること。

Article 517-16第五百十七条の十六

Signal for Pulling Down Work(引倒し等の作業の合図)
Article 517-16, paragraph (1)

When carrying out the work of pulling down outer walls, posts, etc., in carrying out the work set forth in Article 6, item (xv)-5 of the Order, the employer must set fixed signals for the pulling down work, and make them known to the workers concerned.

事業者は、令第六条第十五号の五の作業を行う場合において、外壁、柱等の引倒し等の作業を行うときは、引倒し等について一定の合図を定め、関係労働者に周知させなければならない。

Article 517-16, paragraph (2)

In carrying out the work of pulling down, etc. set forth in the preceding paragraph, when there is a risk of danger arising from the pulling down, etc. to persons engaged in work other than the workers engaged in that work of pulling down, etc. (hereinafter referred to as "other persons engaged in work" in this Article), the employer must have the workers engaged in that work give the signals set forth in the same paragraph in advance, and must not have that work of pulling down, etc. carried out unless the workers have confirmed that the other persons engaged in work have evacuated.

事業者は、前項の引倒し等の作業を行う場合において、当該引倒し等の作業に従事する労働者以外の作業従事者(以下この条において「他の作業従事者」という。)に引倒し等により危険を生ずるおそれのあるときは、当該引倒し等の作業に従事する労働者に、あらかじめ、同項の合図を行わせ、他の作業従事者が避難したことを確認させた後でなければ、当該引倒し等の作業を行わせてはならない。

Article 517-16, paragraph (3)

The worker engaging in the work of pulling down, etc. set forth in paragraph (1), when there is a risk of the danger set forth in the preceding paragraph, must give signals in advance, and must not carry out that work of pulling down, etc. unless having confirmed that other persons engaged in work have evacuated.

第一項の引倒し等の作業に従事する労働者は、前項の危険を生ずるおそれのあるときは、あらかじめ、合図を行い、他の作業従事者が避難したことを確認した後でなければ、当該引倒し等の作業を行つてはならない。

Article 517-17第五百十七条の十七

Appointment of an Operations Supervisor of Demolition of Concrete Structures(コンクリート造の工作物の解体等作業主任者の選任)
Article 517-17, paragraph (1)

As regards the work set forth in Article 6, item (xv)-5 of the Order, the employer must appoint an operations supervisor of demolition of concrete structures from the persons who have completed the skill training course for operations supervisor of demolition of concrete structures.

事業者は、令第六条第十五号の五の作業については、コンクリート造の工作物の解体等作業主任者技能講習を修了した者のうちから、コンクリート造の工作物の解体等作業主任者を選任しなければならない。

Article 517-18第五百十七条の十八

Duties of the Operations Supervisor of Demolition of Concrete Structures(コンクリート造の工作物の解体等作業主任者の職務)
Article 517-18, paragraph (1)

The employer must have the operations supervisor of demolition of concrete structures carry out the following matters:

事業者は、コンクリート造の工作物の解体等作業主任者に、次の事項を行わせなければならない。

Article 517-18, paragraph (1), item (i)

to decide the work method and placement of workers, and directly supervise the work;

作業の方法及び労働者の配置を決定し、作業を直接指揮すること。

Article 517-18, paragraph (1), item (ii)

to inspect the function of instruments, tools, fall arrest equipment with the required performance, etc., and safety helmets and remove those defective; and

器具、工具、要求性能墜落制止用器具等及び保護帽の機能を点検し、不良品を取り除くこと。

Article 517-18, paragraph (1), item (iii)

to monitor the use of fall arrest equipment with the required performance, etc., and safety helmets.

要求性能墜落制止用器具等及び保護帽の使用状況を監視すること。

Article 517-19第五百十七条の十九

Wearing of Safety Helmets(保護帽の着用)
Article 517-19, paragraph (1)

When carrying out the work set forth in Article 6, item (xv)-5 of the Order, the employer must have the workers engaging in the work wear a safety helmet in order to prevent workers from dangers due to objects that come flying or falling.

事業者は、令第六条第十五号の五の作業を行うときは、物体の飛来又は落下による労働者の危険を防止するため、当該作業に従事する労働者に保護帽を着用させなければならない。

Article 517-19, paragraph (2)

The worker engaging in the work set forth in the preceding paragraph must wear the safety helmet set forth in the same paragraph.

前項の作業に従事する労働者は、同項の保護帽を着用しなければならない。

© 2026 japanlaw.orgA copy for reading and reference — not an official source, and not legal advice. Only the Japanese text published by the government has legal effect.Run by Genjido LLC (源氏道合同会社) · contact@genjido.comContactSourcesTermsPrivacy