Section 9 Contracts for Work

第九節 請負

Article 632Contracts for Work

第六百三十二条(請負)

A contract for work become effective when one of the parties promises to complete work and the other party promises to pay remuneration for the outcome of the work.

請負は、当事者の一方がある仕事を完成することを約し、相手方がその仕事の結果に対してその報酬を支払うことを約することによって、その効力を生ずる。

Article 633Timing of Payment of Remuneration

第六百三十三条(報酬の支払時期)

Remuneration must be paid simultaneously with delivery of the subject matter of work performed; provided, however, that if no delivery of a thing is required, the provisions of Article 624, paragraph (1) apply mutatis mutandis.

報酬は、仕事の目的物の引渡しと同時に、支払わなければならない。ただし、物の引渡しを要しないときは、第六百二十四条第一項の規定を準用する。

Article 634Remuneration in Proportion to Benefit Received by Party Ordering Work

第六百三十四条(注文者が受ける利益の割合に応じた報酬)

In the following cases, if the party ordering work receives any benefit from the performance of any divisible portion of the outcome of the work that the contractor has already completed, that portion is deemed to be the completed work; in this case, the contractor may demand remuneration in proportion to the benefit to be received by the party ordering work:

次に掲げる場合において、請負人が既にした仕事の結果のうち可分な部分の給付によって注文者が利益を受けるときは、その部分を仕事の完成とみなす。この場合において、請負人は、注文者が受ける利益の割合に応じて報酬を請求することができる。

if the contractor is no longer able to complete the work due to any grounds not attributable to the party ordering work; or

注文者の責めに帰することができない事由によって仕事を完成することができなくなったとき。

if the contract for work is cancelled before the completion of work.

請負が仕事の完成前に解除されたとき。

Article 635

第六百三十五条

削除 · deleted

Deleted

削除

Article 636Limitation on Contractor's Warranty

第六百三十六条(請負人の担保責任の制限)

If the contractor delivers to the party ordering work of a content the subject matter of work that does not conform to the contract terms with respect to the kind or quality (in the case of the subject matter of work that is not required to be delivered, if the subject matter of work does not conform to the terms of the contract with respect to the kind or quality when the work is finished), the party ordering work may not demand completion of the non-conformity of performance, demand a reduction of the remuneration, claim damages, or cancel the contract, on the grounds of the non-conformity caused by the nature of the materials that the party ordering work has provided or any instructions that the relevant party has given; provided, however, that this does not apply if the contractor knew that the materials or instructions were inappropriate but did not notify the ordering party of this.

請負人が種類又は品質に関して契約の内容に適合しない仕事の目的物を注文者に引き渡したとき(その引渡しを要しない場合にあっては、仕事が終了した時に仕事の目的物が種類又は品質に関して契約の内容に適合しないとき)は、注文者は、注文者の供した材料の性質又は注文者の与えた指図によって生じた不適合を理由として、履行の追完の請求、報酬の減額の請求、損害賠償の請求及び契約の解除をすることができない。ただし、請負人がその材料又は指図が不適当であることを知りながら告げなかったときは、この限りでない。

Article 637Limitation on Period of Warranty with Respect to Kind or Quality of Subject Matter

第六百三十七条(目的物の種類又は品質に関する担保責任の期間の制限)

In the case prescribed in the main clause of the preceding Article, if the party ordering work fails to notify the contractor of the non-conformity to the terms of the contract within one year from the time when the party becomes aware of it, the party ordering work may not demand completion of the non-conformity of performance, demand a reduction of the remuneration, claim compensation for damage, or cancel the contract.

前条本文に規定する場合において、注文者がその不適合を知った時から一年以内にその旨を請負人に通知しないときは、注文者は、その不適合を理由として、履行の追完の請求、報酬の減額の請求、損害賠償の請求及び契約の解除をすることができない。

The provisions of the preceding paragraph do not apply if the contractor knew or did not know due to gross negligence the non-conformity referred to in that paragraph at the time when the contractor delivers the subject matter of work (in the case of the subject matter of work that is not required to be delivered, when the work is finished).

前項の規定は、仕事の目的物を注文者に引き渡した時(その引渡しを要しない場合にあっては、仕事が終了した時)において、請負人が同項の不適合を知り、又は重大な過失によって知らなかったときは、適用しない。

Articles 638 to 640

第六百三十八条から第六百四十条まで

削除 · deleted

No English for this paragraph yet.

削除

Article 641Cancellation of Contract by Party Ordering Work

第六百四十一条(注文者による契約の解除)

The party ordering work may cancel the contract at any time whilst the contractor has not completed the work by paying compensation for damage.

請負人が仕事を完成しない間は、注文者は、いつでも損害を賠償して契約の解除をすることができる。

Article 642Cancellation on Commencement of Bankruptcy Proceeding for Party Ordering Work

第六百四十二条(注文者についての破産手続の開始による解除)

If the party ordering work receives an order commencing bankruptcy proceeding, the contractor or the bankruptcy trustee may cancel the contract; provided, however, that this does not apply to the cancellation of the contract by the contractor after the work is completed.

注文者が破産手続開始の決定を受けたときは、請負人又は破産管財人は、契約の解除をすることができる。ただし、請負人による契約の解除については、仕事を完成した後は、この限りでない。

In the case prescribed in the preceding paragraph, the contractor may participate in the distribution of the bankruptcy estate with respect to the remuneration for the work already completed and expenses not included in this.

前項に規定する場合において、請負人は、既にした仕事の報酬及びその中に含まれていない費用について、破産財団の配当に加入することができる。

In the cases referred to in paragraph (1), claims for compensation for damage suffered as a result of the cancellation of the contract are permitted only for contractors under contracts cancelled by the bankruptcy trustee. In such a case, the contractors participate in the distribution of the bankruptcy estate with respect to that compensation for damage.

第一項の場合には、契約の解除によって生じた損害の賠償は、破産管財人が契約の解除をした場合における請負人に限り、請求することができる。この場合において、請負人は、その損害賠償について、破産財団の配当に加入する。