# 労働安全衛生規則 / Ordinance on Industrial Safety and Health — 第三百四十六条 (Article 346)

This is the Markdown twin of https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-346. Every law, and how to address a provision: https://japanlaw.org/llms.txt. The same laws as MCP tools (no sign-in): https://japanlaw.org/mcp.

- Law: 労働安全衛生規則 (Ordinance on Industrial Safety and Health), 昭和四十七年労働省令第三十二号
- English title "Ordinance on Industrial Safety and Health": Ministry of Justice translation
- Kind: MinisterialOrdinance — the distinction between 法律 (Act), 政令 (Cabinet Order), 省令 (Ministerial Order) and 条例 (local ordinance) decides who may issue it and what it may say.
- Provision: 第三百四十六条 (Article 346)（低圧活線作業） — address `art-346`
- Text in force since: 2026-10-01
- URL (the page that opens at this provision): https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-346
- e-Gov law ID: 347M50002000032 — never renamed. A permanent link, `/l/{lawId}/{address}` on this site, redirects to the page.
- Every provision below carries its address and its URL on the line under it.
- Japanese text: e-Gov 法令検索, Digital Agency (デジタル庁). English: as marked on each line below.

Only the Japanese as published by the government has legal effect; the text
below is a copy of it. Every English rendering below is a translation and
says which kind: the Ministry of Justice's translation, or this
site's machine translation, whose model and date the Sources list names.
They are never merged and never substituted for one another.

---

### 第三百四十六条（低圧活線作業） — (Low Voltage Live Line Work)
<sup>caption: Ministry of Justice translation — Japanese Law Translation Database System</sup>
<sup>art-346 · https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-346</sup>

    **第一項**  事業者は、低圧の充電電路の点検、修理等当該充電電路を取り扱う作業を行なう場合において、当該作業に従事する労働者について感電の危険が生ずるおそれのあるときは、当該労働者に絶縁用保護具を着用させ、又は活線作業用器具を使用させなければならない。
    <sup>art-346/par-1 · https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-346/par-1</sup>
    In carrying out the work of handling a low voltage charged circuit, such as inspecting or repairing the circuit, and when there is a risk of causing danger of electric shock to the worker engaging in the work, the employer must have the worker wear personal insulating protective equipment or use live line work instruments.
    <sup>Ministry of Justice translation — Japanese Law Translation Database System</sup>

    **第二項**  労働者は、前項の作業において、絶縁用保護具の着用又は活線作業用器具の使用を事業者から命じられたときは、これを着用し、又は使用しなければならない。
    <sup>art-346/par-2 · https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-346/par-2</sup>
    A worker, when having been instructed to wear personal insulating protective equipment or use live line work instruments by the employer in carrying out the work set forth in the preceding paragraph, must wear or use them, respectively.
    <sup>Ministry of Justice translation — Japanese Law Translation Database System</sup>

---

## Cites
- art-346/par-2: 前項 → 労働安全衛生規則 第三百四十六条第一項 (Article 346, paragraph (1)), art-346/par-1 — https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-346/par-1

## Cited by

3 provisions cite this one. No official source publishes this direction.

- 労働安全衛生規則 第三百四十六条第二項（低圧活線作業） — https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-346/par-2
- 労働安全衛生規則 第三百四十八条第一項第五号（絶縁用保護具等） — https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-348/par-1/item-5
- 労働安全衛生規則 第三百五十二条第一項（電気機械器具等の使用前点検等） — https://japanlaw.org/en/industrial-safety-and-health-ordinance/art-352/par-1

---

## Sources

- e-Gov 法令検索, Digital Agency (デジタル庁) — 労働安全衛生規則 — the text in force from 2026-10-01 (https://laws.e-gov.go.jp/law/347M50002000032/20261001_508M60000100116), retrieved 2026-11-13
- Japanese Law Translation Database System, Ministry of Justice (法務省) — Ordinance on Industrial Safety and Health — Ministry of Justice translation (https://www.japaneselawtranslation.go.jp/en/laws/view/3878/tb), retrieved 2026-11-13
- This site's parser, version 240 — 労働安全衛生規則 — structure, counts, cross-references and defined terms, computed 2026-11-13